Sunday, January 30, 2011

Power Distribution and Wiring




We are now into our 23rd day of the build season and with one robot drivetrain completed, today's efforts concentrated on several other areas.










The frame for robot #2 continued with drilling axle spacers and bracing. 















Work on the wire routing and crimping continued on robot #2 between the power distribution
board and the controllers.






Construction of the fabric covers for the foam bumpers began today with many yards of fabric cut to size by two of our talented parent mentors. 










Two red and two blue bumper covers must be sewn for each of the four sides of the robot frame (one set for each team).

No comments:

Post a Comment